Galileo/Jupiter spacecraft deployed six hours, 30 minutes into flight placing Galileo on trajectory for six-year trip to Jupiter via gravitational boosts from Venus and Earth.
The patch is made by AB Emblems, the NASA Contractor for mission emblems. This 4 inch diameter embroidered patch was the emblem of Space Shuttle Mission STS-34.